2024

Offshore WindFarm

Below are all OECD Category A projects for which Credendo received an application for insurance cover.  

Category A projects

Greater Changhua 4

  • Publication date: 24.01.2024
  • Country: Taiwan
  • Project description: Greater Changhua offshore wind farms are four wind farm sites located off the coast of Changhua. While 900MW Greater Changhua 1 (605,2MW) & 2a (294,8MW) are already under construction, Greater Ghanghua 2B (337,1MW) & 4 offshore wind farms are to be developed in the future. This transaction is related to.the Greater Changhua 4 project, a 582,9MW offshore wind farm.
  • Classification: Category A
  • Credendo contact: esg-eca@credendo.com  

Olounou-Oveng route

  • Publication date: 16.02.2024
  • Country: Cameroon
  • Project description: The project concerns the construction (phase I) of the Olounou-Oveng road (70 km) in the South Region of Cameroon, linking Cameroon to Gabon. The works include road widening and asphalting; installation of concrete gutters; construction of 72 small bridges (‘dalots’); construction of 13 bridges; and installation of signage. The project promoter is the Government of Cameroon, represented by the Ministry of Public Works (MINTP).
  • Classification: Category A
  • Credendo contact: esg-eca@credendo.com  

Boto Gold Mine

  • Publication date: 02.05.2024
  • Country: Senegal
  • Project description: The project concerns the development of an open pit gold mine with mineral reserves of 31.5 million tons of ore grading 1.6 g/t gold. The expected life of mine is 11 years. Boto mine is situated in the South-East of Senegal in the Region of Kédougou, close to the Senegal‐Mali‐ Guinea borders.
  • Classification: Category A
  • Credendo contact: esg-eca@credendo.com  

Baomahun Gold mine project

  • Publication date: 23.05.2024
  • Country: Sierra Leone
  • Project description: The project concerns a new integrated poultry project in Chalinze District in Pwani Region. The project will consist of two farms where one will be for parent stocks rearing for hatchery eggs production and a second farm will be for broiler chicken rearing for meat production. In addition, the project will also consist of a hatchery for eggs incubation, a slaughterhouse, a feed mill plant for production of poultry feed, a meat processing plant and supporting facilities.
  • Classification: Category A
  • Credendo contact: esg-eca@credendo.com  

Integrated Poultry Project

  • Publication date: 27.05.2024
  • Country: Tanzania
  • Project description: The project concerns a new integrated poultry project in Chalinze District in Pwani Region. The project will consist of two farms where one will be for parent stocks rearing for hatchery eggs production and a second farm will be for broiler chicken rearing for meat production. In addition, the project will also consist of a hatchery for eggs incubation, a slaughterhouse, a feed mill plant for production of poultry feed, a meat processing plant and supporting facilities.
  • Classification: Category A
  • Credendo contact: esg-eca@credendo.com  

Ocean Cay 2

  • Publication date: 28.08.2024
  • Country: The Bahamas
  • Project description: The project concerns further development of Ocean Cay 2, a converted artificial island originally used for industrial purposes, now dedicated to touristic activities.
  • Classification: Category A
  • Credendo contact: esg-eca@credendo.com  

Koné Mine

  • Publication date: 26.11.2024
  • Country: Côte d’Ivoire
  • Project description: The project concerns the development of Koné Gold Project, a new mining project situated in Côte d’Ivoire.
  • Classification: Category A
  • Credendo contact: esg-eca@credendo.com  

Aurore Island

  • Publication date: 26.11.2024
  • Country: Seychelles
  • Project description: The project concerns land reclamation works for industrial and commercial purposes.
  • Classification: Category A
  • Credendo contact: esg-eca@credendo.com